| waiting ......... |

|
| Waiting to be delivered to Brixton Yards |
With the start of the day sunny and with not much cloud in the sky, our rack of rolling
stock was waiting for the commencment of the delivery. Wayne Seed, one of our members, is the locomotive operator, with the
help of Galvin Lashlie.
The media were on hand to gather information and photos, as with the local, 7 Taranaki,
TV station, before rolling out from the Smart Road Yards New Plymouth.
When the train passed under the road over bridge by Lepperton, there are members
from our Society, as with the media were busy doing their thing with their cameras. Once at Leperrton, the clearance was given
by Train Control, we started down the branch to our Brixton yards. This is the first time in about ten years or so since
there have been any traffic down the Branch. Once at Brixton there are more members waiting for the arrival of the delivery.
Again the cameras were busy until the train was parked up for a while, until the Society gets it's operating licence.
| The Documentation |

|
| Wayne reading the first official authority for the shunt on the Branch |
Special Shunting Service conveyed, Tr 407,Uc 248 and 507,Ea
3298,Zp 10063 and a Ur wagon from New Plymouth to Lepperton and hauled by Dsc 2584, the later is also owned by the Society
| At Lepperton |

|
| Waiting at Lepperton for the go ahead through the switch to our Brixton yards from Train Control |
|